Change Hub and Sequence on a Shipment

Overview

Some customers require all shipments on a load be placed in a certain order. Planners can sequence the load to meet customer's requirements by adding a Delivery Order reference type to every shipment on the load. The Change Hub and Sequence feature allows quick access to a shipment's Delivery Order and assigned hubs.

Process

To Change Hub and Sequence on a Shipment:

  1. Access Dock Planning. See Access Dock Planning.
  2. Search for the loads. See Search for Active Loads.
  3. Click the arrow of the selected load.
  4. Click Change Hubs and Sequence for the shipment to be updated.

The Change Centers / Delivery Order page opens.

  1. Enter the Delivery Order number.
  2. Click Save Delivery Order to save the delivery order or Cancel to exit without savings.
  3. Click Change to edit the consol or process hub if necessary.
  4. If changes were made to the consolidation or processing hub, click Save Hub to save the new hub information. Click Cancel to exit without changes.

Result

The Delivery Order shipment reference is updated with the numerical loading sequence. This process should be completed for all shipments on the load that require updates.